STATE ELECTRIC COMPANY LIMITED
|
|
|
|
|
Electrification
New and Existing Connection (via Distribution Box and Panel Board)
For Electricity installation to new premises with separate billing. Click here to download the application form.
Guide to New/Existing Installation ENG | DHI
Temporary Connection
For Areas where no permanent electricity connection exists. ( party’s, functions..etc). Click here to download the application form.
kWh Meter Testing (new and existing) and Replacing
Calibration of new kWh Meters for Electricity suppliers, testing and replacing existing electricity meters at premises. Click here to download the application form.
Guide to kWh Meter Testing (premises) ENG
Guide to kWh meter testing (Calibration) ENG
Guide to Replace kWh Meter ENG
kWh Meter approving (minimum 5 meters)
For approval of new kWh meter brands to be used in the Maldives. Click here to download the application form.
Relocate Meter board, Sub Distribution Box and Main Distribution Box
Relocation of the meter boards and distribution boxes due to renovation, construction...etc of the premises. Click here to download the application form.
Guide to relocate kWh Meter Board ENG | DHI
Guide to relocate MDB ENG | DHI
Guide to relocate SDB ENG | DHI
Earth leakage circuit breaker(ELCB) testing
Testing of ELCB compliance to MEA regulation. Click here to download the application form.
ELCB Testing ENG | DHI
Electricity Installation Testing
For New premises prior to a new installation and for existing premises after changes to existing wiring. Click here to download the application form.
Electrical Installation Testing ENG | DHI
Disconnection (temporary and permanent DBConnecton via Distribution Box & Panel Board)
Disconnection of electricity supply. Click here to download the application form.
Disconnect Electricity Temporarily ENG | DHI
Disconnect Electricity Permanently ENG | DHI
Reconnection (via Distribution Box & Panel Board)
For Reconnection of temporarily disconnected electricity connections. Click here to download the application form.
Guide to Reconnection ENG | DHI
Replacing Existing Cable
Replacing existing cable due to supply shorts and as per customer requirements. Click here to download the application form.
Guide to Replace Existing Cable ENG | DHI
Cable size and cost for electrification (substation to panel)
An electricity connection cost estimate for customers consuming power between 63A to 300A. Click here to download the application form.
Change Registry Information
If there is any change in a customer information, this form must be filled and submitted. We will update the customer information after surveying the premises. Click here to download the change registry information form.
|
|
|
|